Lift an old kitchen or bathroom floor and you’ll often find a layer of small square tiles underneath, sometimes stuck down with black adhesive. Thermoplastic and vinyl floor tiles were made with asbestos until 1992, and the adhesive can contain it too.
Why it matters for a refit
Intact tiles under a newer floor are unlikely to release fibres. The problem is the work itself: prising tiles up, grinding off adhesive or sanding the screed to level it all break the material up.
Before your fitter starts
- Ask whether the new floor can go over the old one, which is often the simplest option.
- If the tiles need to come up, have them and the adhesive sampled first.
- Make sure your fitter has the result before they price the job.
What the survey looks at
For a kitchen or bathroom refit, a refurbishment survey of those rooms looks under the floor coverings and inside boxing and panels where the work will happen. Anything found can then be planned around rather than discovered on day one.
Planning a refit? Try the survey planner on our home page, or call 020 3386 1854.
